Date Field Control
Instructions |
|
Date Control Ico The icon that controls the Date Control. |
![]() |
Designate Signer Select the appropriate signer if the document is sent to more than one recipient. |
![]() |
Option: Required Check requires that the Date Control be completed by the assigned recipient to submit this signature request. |
![]() |
Cancel Press the cancel icon to close the Date Control window. |
![]() |
Confirm Press the green check mark when complete to add the Date Control to the document. |
![]() |
Date Field The Date Control appears as shown on the document. |
![]() |
Date Field Hover When the mouse hovers over the Date Control, it reveals who it is assigned to and allows the document creator to edit and delete the control. |
![]() |